FREQUENTLY ASKED QUESTIONS

 
 

What is the WWGC?
The WWGC is a group of dedicated volunteers striving to further develop the unexcavated areas of the Willow Waterhole Stormwater Detention facility. It works closely with the Harris County Flood Control District (HCFCD) and with the City of Houston Parks and Recreation Department (HPARD). 

What is the Willow Waterhole Greenway Project?
The Willow Waterhole Greenway Project is part of Project Brays and is intended to provide stormwater protection for surrounding and upstream residents and businesses and also to increase protection for The Texas Medical Center. It is also intended to provide a dual use facility stormwater detention, additional greenspace, habitat restoration, educational opportunities, and recreational amenities.

When will the park be ready to visit?
You can visit the park now.

Where is the park located?
Roughly between Chimney Rock and South Post Oak near South Main (highway 90A).

How do I get there? 

Directions from 610 West:

  •   South on 610 West to South Post Oak
  •   Right on South Willow (before HWY 90) to Ricecrest

Where do I park my car?
Because the park is still in the early stages of development no official parking space has been created.  In the mean time, please park along one of the streets adjacent to the park. Also, there are businesses nearby like The Gathering Place at South Willow and Ricecrest that have vacant lots during off hours and weekends. Please look at our map for marked parking options.

When will the entire park be completed?

Excavation for storm water detention ponds is expected to be completed in 2016 or later depending on federal reimbursement schedules to the Harris County Flood Control District (HCFCD).  The park will always be in a state of continuous improvement.

What will there be to do at the park?

Currently: walking trails, gazebo's, bird watching, picnicking, etc.
Future: we look forward to offering many more passive recreation items at the park as it develops.

What environmental considerations will be taken for the park?

The land is being evaluated for native plant species and preservation steps are being taken where possible and new trees will be planted when construction is completed.  The park will be designed to be a passive recreation space so no greenspace will be overused or damaged and attract wildlife to the area.  Dilapidated buildings are being removed and replaced with the park.  Trash will be picked up on a regular basis.

What is the total cost of the park?
This is an ongoing process.  A final figure is to be determined.

What is Project Brays?
Project Brays (also known as the Brays Bayou Flood Damage Reduction Project), is a cooperative effort between the Harris County Flood Control District (HCFCD) and the U.S. Army Corps of Engineers. Designed to benefit thousands of residents and businesses by reducing the risk of flood damage, Project Brays is the largest, most extensive projects ever to be managed by the HCFCD.

How can I stay informed of the project?
There are several ways that information about Willow Waterhole can be obtained:

  • Go to the Contact Us page and request to be added to the WWGC mailing list to receive regular e-updates and information on upcoming meetings, construction, project progress, etc.
  • Request a presentation from WWGC.
  • Attend public meetings or open houses in your area, which are listed in the events calendar.